Construction Date: put into operation in March, 2016
Project Location: Xiqing district, Tianjin
Project Construction Scale: 1.6t, parabolic trough reflector area: 2250m2.
Main Construction Content: Design and use Vicot solar parabolic trough collector boiler system
Project Energy Savings:Every year, the project saves standard coal of 407 ton, decreases CO2 emissions by 1006 ton, SO2 emissions by 8 ton and dust emissions by 4 ton.